Ather Energy IPO

Amaan Khan | April 22, 2025

Ather Energy is all set to launch its IPO on April 28, 2025, and it will remain open for subscription till April 30, 2025. This is a Book Built Issue, where the company aims to raise around ₹3,100.00 crores through a fresh issue, along with an offer for sale of up to 2,20,00,766 equity shares, each having a face value of ₹1.

The price band for the IPO has been set at ₹304to ₹321 per share (assumed example – feel free to update if actual values are released). The allocation for investors is divided as follows:

  • Retail investors: 10%

  • Qualified Institutional Buyers (QIB): 75%

  • High Net-worth Individuals (HNI): 15%

Ather Energy is expected to list on both BSE and NSE on May 5, 2025, and the IPO allotment is likely to be finalized by May 1, 2025.

Looking at the company’s financials, Ather reported a revenue of ₹1,789.1 crores in FY 2024, which is slightly down from ₹1,801.8 crores in FY 2023. However, the losses also came in high, with ₹863.9 crores in FY 2024, compared to a loss of ₹1,062.3 crores in FY 2023.

While the company is still in the red, Ather Energy operates in the fast-growing EV space, and many experts believe that the IPO could be a good opportunity for long-term investors who believe in the EV growth story.

Ather Energy IPO details

IPO Open Date:28-Apr-25
IPO Close Date:30-Apr-25
Face Value:₹1 Per Equity Share
IPO Price Band:₹ 304 to ₹ 321
Issue Size:₹2,980.73 Crores
Fresh Issue:Approx ₹3,100 Crores
Offer for Sale:Approx 2,20,00,766 Equity Shares
Issue Type:Book Built Issue
IPO Listing:BSE & NSE
Retail Quota:Not more than 10%
QIB Quota:Not more than 75%
NII Quota:Not more than 15%
DRHP Draft Prospectus:Click Here
RHP Draft Prospectus:Click Here

ATHER ENERGY 's IPO LOT SIZE

The Ather Energy IPO minimum market lot is [46] shares with ₹[14766] application amount. The retail investors can apply up-to 13 lots with [598] shares of ₹[191958] amount.

ApplicationLot SizeSharesAmount
Retail Minimum14614766
Retail Maximum13598₹1,91,958
S-HNI Minimum14644₹2,06,724
B-HNI Minimum683,128₹10,04,088

Ather Energy IPO Dates

The Ather Energy IPO date is 28 April and the close date is 30 April. The Ather Energy IPO allotment will be finalized on 1 May and the IPO listing on 5 May

IPO Open Date:28-Apr-25
IPO Close Date:30-Apr-25
IPO Listing Date:5-May-25
Refunds:2-May-25
Credit to Demat Account:2-May-25
Basis of Allotment:1-May-25

About prormoters & Ather energy

The promoters of the company are Tarun Sanjay Mehta, Swapnil Babanlal Jain And Hero Motocorp Limited.

Ather Energy is one of the leading names in India’s electric two-wheeler (E2W) space. Known for its cutting-edge technology and focus on sustainability, Ather designs and manufactures high-performance electric scooters, battery packs, charging infrastructure, and related software — all right here in India.

What truly sets Ather apart is its end-to-end in-house approach. From building battery packs to assembling electric scooters, the company ensures top-notch quality and constant innovation at every step. It’s a true “Make in India” brand driving the future of clean mobility.

Ather was also the first two-wheeler EV OEM in India to roll out a dedicated fast-charging network — the Ather Grid. This growing network is helping make EV adoption smoother and more convenient across the country.

So far, Ather has sold over 1,09,577 electric scooters, solidifying its position as a frontrunner in India’s shift towards electric mobility.

Ather Energy is all set to launch its IPO on April 28, 2025, and it will remain open for subscription till April 30, 2025. This is a Book Built Issue, where the company aims to raise around ₹3,100.00 crores through a fresh issue, along with an offer for sale of up to 2,20,00,766 equity shares, each having a face value of ₹1.

Finance Report

In terms of financials, Ather Energy reported a revenue of ₹1,789.1 crores in FY 2024, slightly lower than the ₹1,801.8 crores recorded in FY 2023. The company’s net loss stood at ₹863.9 crores in 2024, which is an improvement compared to a loss of ₹1,062.3 crores in the previous year, indicating progress toward reducing its operational deficits.

Period EndedRevenueExpenseProfit After TaxAssets
2022₹413.8₹757.9₹344.6₹818.6
2023₹1,801.8₹2,666.3₹863.9₹1,976.8
2024₹1,789.1₹2,674.2₹1,062.3₹1,913.5

Some important ratio of FY 2024

Check the key valuation details of Ather Energy IPO, like Earnings Per Share (EPS), Price-to-Earnings (P/E) Ratio, Return on Net Worth (RoNW), and Net Asset Value (NAV).

KPIValues
ROE:–1.83%
ROCE:-118.68%
EBITDA Margin:-36%
PAT Margin:-59%
Debt to equity ratio:0.88
Earning Per Share (EPS):–₹47 (Basic)
Price/Earning P/E Ratio:N/A
Return on Net Worth (RoNW):-194%
Net Asset Value (NAV):₹24

Peer group company

CompanyEPSPE RatioRoNW %NAVIncome
Ola Electric Mobility Limited-4NA-78%65,009.8 Cr.
Eicher Motors Limited1463322%65716,535.8 Cr.
Hero MotoCorp Limited1873021%88437,788.6 Cr.
TVS Motors Limited367826%14339,144.7 Cr.
Bajaj Auto Limited2734029%93544,870.4 Cr.

Object of IPO


The funds raised from the IPO will be used for several key purposes, including:

  • Setting up a new electric two-wheeler (E2W) factory in Maharashtra

  • Repaying or prepaying some of the company’s existing loans

  • Investing in research and development (R&D)

  • Spending on marketing and brand promotion

  • Covering general business needs and operations

Ather Energy (IPO)registrar

MUFG Intime India Private Limited
Phone: +91 81 0811 4949
E-mail: atherenergy.ipo@linkintime.co.in
Website: https://in.mpms.mufg.com/Initial_Offer/public-issues.htmlr

Merchant bankers

  • Axis Capital Limited
  • HSBC Securities and Capital Markets (India) Private Limited
  • JM Financial Limited
  • Nomura Financial Advisory and Securities (India) Private Limited

Company Address

Ather Energy Limited
3rd Floor, Tower D, IBC Knowledge Park,
#4/1 Bannerghatta Main Road,
Bangalore 560 029,
Karnataka, India
Phone: +91 80 6646 5750
Email: cs@atherenergy.com
Website: www.atherenergy.com

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top